Chapter 1: 36PGA-2 (page 1)
Question:Blanchette Plant Service completed a special landscaping job for Kerry Company. Blanchette uses ABC and has the following predetermined overhead allocation rates:
Activity Predetermined
Allocation Base Overhead Allocation Rate
Designing Number of designs \( 290 per design
Planting Number of plants \) 20 per plant
The Kerry job included \(750 in plants; \)1,300 in direct labor; one design; and 30 plants.
Requirements
2. If Kerry paid $3,540 for the job, what is the operating income or loss?
Short Answer
Answer
Operating Income: $1,350