Bubba and Danny are college friends planning a skiing trip to Killington before the New Year. They estimated the following for the trip:

Estimated Activity Allocation

Costs Allocation Base Bubba Danny

Food \( 400 Pounds of food eaten 24 26

Skiing 300 Number of lift tickets 2 0

Lodging 280 Number of nights 2 2

\) 980

Requirements

1. Bubba suggests that the costs be shared equally. Calculate the amount each person would pay.

Short Answer

Expert verified

Each person should pay $490.

Step by step solution

01

Overhead allocation

Overhead allocation is the apportionment of cost to each activity or process or person based on a certain ratio. This ratio can be allocation base or can be in any predetermined ratio.

In costing, overhead allocation is important to get the appropriate amount of full cost and to determine the price.

02

Allocation of overhead in the given case

As given, Bubba suggests sharing the coat equally. So the total amount would be shared in the ratio of 1:2 to each person.

costforeachperson=totalcost2=$9802=$490

Unlock Step-by-Step Solutions & Ace Your Exams!

  • Full Textbook Solutions

    Get detailed explanations and key concepts

  • Unlimited Al creation

    Al flashcards, explanations, exams and more...

  • Ads-free access

    To over 500 millions flashcards

  • Money-back guarantee

    We refund you if you fail your exam.

Over 30 million students worldwide already upgrade their learning with Vaia!

One App. One Place for Learning.

All the tools & learning materials you need for study success - in one app.

Get started for free

Most popular questions from this chapter

Eason Company manufactures wheel rims. The controller expects the following ABC allocation rates for 2018:

Activity Allocation Base Predetermined Overhead

Allocation Rate

Materials handling Number of parts $ 4.00 per part

Machine setup Number of setups 400.00 per setup

Insertion of parts Number of parts 26.00 per part

Finishing Number of finishing hours 90.00 per hour

Eason produces two wheel rim models: standard and deluxe. Expected data for 2018 are as follows:

Standard Deluxe

Parts per rim 4.0 7.0

Setups per 500 rims 18.0 18.0

Finishing hours per rim 1.0 5.5

Total direct hours per rim 5.0 6.0

The company expects to produce 500 units of each model during the year.

Requirements

1. Compute the total estimated indirect manufacturing cost for 2018.

Question:Blanchette Plant Service completed a special landscaping job for Kerry Company. Blanchette uses ABC and has the following predetermined overhead allocation rates:

Activity Predetermined

Allocation Base Overhead Allocation Rate

Designing Number of designs \( 290 per design

Planting Number of plants \) 20 per plant

The Kerry job included \(750 in plants; \)1,300 in direct labor; one design; and 30 plants.

Requirements

1. What is the total cost of the Kerry job?

Question:Lally, Inc. produces universal remote controls. Lally uses a JIT costing system. One of the company’s products has a standard direct materials cost of \(9 per unit and a standardconversion cost of \)35 per unit. During January 2018, Lally produced 500 unitsand sold 495 units on account at \(45 each. It purchased \)4,800 of direct materials onaccount and incurred actual conversion costs totaling \(14,000.

Requirements

1. Prepare summary journal entries for January.

2. The January 1, 2018, balance of the Raw and In-Process Inventory account was\)70. Use a T-account to find the January 31 balance.

3. Use a T-account to determine whether conversion costs are overallocated orunderallocated for the month. By how much? Prepare the journal entry to adjustthe Conversion Costs account.

Martin, Inc. manufactures bookcases and uses an activity-based costing system. Martin’s activity areas and related data follow:

Activity

Budgeted Cost of Activity

Allocation Base

Predetermined Overhead Allocation Rate

Materials handling

\( 230,000

Number of parts

\)1.50

Assembly

3,200,000

Number of assembling direct labor hours

16.00

Finishing

150,000

Number of finished units*

3.00

*Refers to the number of units receiving the finishing activity, not the number of units transferred to Finished Goods Inventory

Martin produced two styles of bookcases in April: the standard bookcase and an unfinished bookcase, which has fewer parts and requires no finishing. The totals for quantities, direct materials costs, and other data follow:

Product

Total Units Produced

Total Direct materials Costs

Total Direct Labor Costs

Total Number of Parts

Total Assembling Direct Labor Hours

Standard bookcase

3,000

\(54,000

\)67,500

9,000

4,500

Unfinished bookcase

3,500

56,000

52,500

7,000

3,500

Requirements

4. What price should Martin’s managers set for unfinished bookcases to earn a net profit of $19 per bookcase?

Turbo Champs Corp. uses activity-based costing to account for its motorcycle manufacturing process. Company managers have identified three supporting manufacturing activities: inspection, machine setup, and machine maintenance. The budgeted activity costs for 2018 and their allocation bases are as follows:

Activity Total Budgeted Cost Allocation Base

Inspections \( 5,700 Number of inspections

Machine setup 22,000 Number of setups

Machine maintenance 6,000 Finishing of machine hours

Total \) 33,700

Turbo Champs expects to produce 20 custom-built motorcycles for the year. The motorcycles are expected to require 100 inspections, 40 setups, and 100 machine hours.

Requirements

1. Compute the predetermined overhead allocation rate for each activity.

See all solutions

Recommended explanations on Business Studies Textbooks

View all explanations

What do you think about this solution?

We value your feedback to improve our textbook solutions.

Study anywhere. Anytime. Across all devices.

Sign-up for free