Question:The Santos Shirt Company manufactures shirts in two departments: Cutting and Sewing. The company allocates manufacturing overhead using a single plantwide rate with direct labor hours as the allocation base. Estimated overhead costs for the year are\(500,000, and estimated direct labor hours are 200,000. In June, the company incurred 17,500 direct labor hours.

1. Compute the predetermined overhead allocation rate.

2. Determine the amount of overhead allocated in June.

The Santos Shirt Company has refined its allocation system by separating manufacturing overhead costs into two cost pools—one for each department. The estimated costs for the Cutting Department are \)200,000. They will be allocated based on directlabor hours, which are estimated to be 125,000 hours for the year. The estimated costs for the Sewing Department are $300,000.Those costs will be allocated based on machine hours, which are estimated to be 150,000 hours for the year. In June, the companyincurred 10,000 direct labor hours in Cutting and 12,500 machine hours in Sewing.

3. Compute the predetermined overhead allocation rates for each department.

4. Determine the total amount of overhead allocated in June.

Short Answer

Expert verified

Using the Single allocation method

Plant-wide Overhead rate:$2.5

June’s Overhead cost:$43,750

Using the departmental allocation method

Overhead rate for cutting department:$1.6

Overhead cost or sewing department:$2

June’s Overhead cost:$43,750

Total Cost:$41,000

Step by step solution

01

Step-by-Step-SolutionStep1: Computation of single plantwide overhead allocation rate

Singleplantwideoverheadallocationrate=TotalIndirectcostTotaldirectlaborhour=$500,000200,000=$2.5

02

Computation of June’s overhead cost

June'soverheadCost=Singleplantwideoverheadallocationrate×DirectlaborhourinJune=$2.5×17,500=$43,750

03

Computation of predetermined overhead allocation rate

Forcuttingdepartment=TotalIndirectcostTotaldirectlaborhour=$200,000125,000=$1.6ForSwingDeprtment=TotalIndirectcostTotalmachinehour=$300,000150,000=$2

04

Computation of June’s overhead cost

CuttingCost=Predeterminedoverheadallocationrate×DirectlaborhourinJune=$1.6×10,000=$16,000SewingCost=Predeterminedoverheadallocationrate×MachinehourinJune=$2×12,500=$25,000TotalCost=Cuttingcost+Sewingcost=$16,000+$25,000=$41,000

Unlock Step-by-Step Solutions & Ace Your Exams!

  • Full Textbook Solutions

    Get detailed explanations and key concepts

  • Unlimited Al creation

    Al flashcards, explanations, exams and more...

  • Ads-free access

    To over 500 millions flashcards

  • Money-back guarantee

    We refund you if you fail your exam.

Over 30 million students worldwide already upgrade their learning with Vaia!

One App. One Place for Learning.

All the tools & learning materials you need for study success - in one app.

Get started for free

Most popular questions from this chapter

Question:Blanchette Plant Service completed a special landscaping job for Kerry Company. Blanchette uses ABC and has the following predetermined overhead allocation rates:

Activity Predetermined

Allocation Base Overhead Allocation Rate

Designing Number of designs \( 290 per design

Planting Number of plants \) 20 per plant

The Kerry job included \(750 in plants; \)1,300 in direct labor; one design; and 30 plants.

Requirements

3. If Blanchette desires an operating income of 30% of cost, how much should the company charge for the Kerry job?

Question:Oscar, Inc. manufactures bookcases and uses an activity-based costing system. Oscar’s activity areas and related data follow:

Activity

Budgeted Cost of Activity

Allocation Base

Predetermined Overhead Allocation Rate

Materials handling

\( 240,000

Number of parts

\)1.00

Assembly

3,500,000

Number of assembling direct labor hours

17.00

Finishing

190,000

Number of finished units*

4.50

*Refers to number of units receiving the finishing activity, not the number of units transferred to Finished Goods Inventory

Oscar produced two styles of bookcases in October: the standard bookcase and an unfinished bookcase, which has fewer parts and requires no finishing. The totals for quantities, direct materials costs, and other data follow:

Product

Total Units Produced

Total Direct materials Costs

Total Direct Labor Costs

Total Number of Parts

Total Assembling Direct Labor Hours

Standard bookcase

7,000

\(91,000

\)105,000

28,000

10,500

Unfinished bookcase

7,500

82,500

75,000

22,500

7,500

Requirements

3. Which product costs are reported in the external financial statements? Which costs are used for management decision-making? Explain the difference.

Harcourt Pharmaceuticals manufactures an over-the-counter allergy medication. The company sells both large commercial containers of 1,000 capsules to health care facilities and travel packs of 20 capsules to shops in airports, train stations, and hotels. The following information has been developed to determine if an activity-based costing system would be beneficial:

Activity Estimated Estimated Quantity

Indirect Cost Allocation Base of Allocation Base

Materials handling \( 96,000 Number of kilos 24,000 kilos

Packaging 210,000 Number of machine hours 3,000 hours

Quality assurance 114,000 Number of samples 1,900 samples

Total indirect costs \) 420,000

Other production information includes the following:

Commercial Containers Travel Packs

Units produced 2,800 containers 51,000 packs

Weight in kilos 9,800 5,100

Machine hours 1,960 510

Number of samples 560 765

Requirements

1. Harcourt’s original single plantwide overhead allocation rate system allocated indirect costs to products at $140.00 per machine hour. Compute the total indirect costs allocated to the commercial containers and to the travel packs under the original system. Then compute the indirect cost per unit for each product. Round to two decimal places.

Rennie Plant Service completed a special landscaping job for Brenton Company. rennie uses ABC and has the following predetermined overhead allocation rates:

Activity Predetermined

Allocation Base Overhead Allocation Rate

Designing Number of designs \( 290 per design

Planting Number of plants \) 20 per plant

The Rennie job included \(1,500 in plants; \)800 in direct labor; one design; and 30 plants.

Requirements

1. What is the total cost of the Brenton job?

Koehler (see Exercise E19-15 and Exercise E19-16) makes handheld calculators in two models—basic and professional—and wants to further refine its costing system by allocating overhead using activity-based costing. The estimated \(721,000 of manufacturing overhead has been divided into three primary activities: Materials Handling, Machine Setup, and Insertion of Parts. The following data have been compiled:

Material Handling

Machine Setup

Insertion of Parts

Total

Overhead costs

\) 45,000

\( 136,000

\) 540,000

$ 721,000

Allocation base

Number of parts

Number of setups

Number of parts

Expected usage:

Basic Model

32 parts per calculator

24 setups per year

32 parts per calculator

Professional

Model

58 parts per calculator

44 setups per year

58 parts per calculator

Requirement 2

Compare your answers for Exercise E19-15, Exercise E19-16, and Exercise E19-17. What conclusions can you draw?

See all solutions

Recommended explanations on Business Studies Textbooks

View all explanations

What do you think about this solution?

We value your feedback to improve our textbook solutions.

Study anywhere. Anytime. Across all devices.

Sign-up for free