Eason Company manufactures wheel rims. The controller expects the following ABC allocation rates for 2018:

Activity Allocation Base Predetermined Overhead

Allocation Rate

Materials handling Number of parts $ 4.00 per part

Machine setup Number of setups 400.00 per setup

Insertion of parts Number of parts 26.00 per part

Finishing Number of finishing hours 90.00 per hour

Eason produces two wheel rim models: standard and deluxe. Expected data for 2018 are as follows:

Standard Deluxe

Parts per rim 4.0 7.0

Setups per 500 rims 18.0 18.0

Finishing hours per rim 1.0 5.5

Total direct hours per rim 5.0 6.0

The company expects to produce 500 units of each model during the year.

Requirements

2. Prior to 2018, Eason used a single plantwide overhead allocation rate system with direct labor hours as the allocation base. Compute the predetermined overhead allocation rate based on direct labor hours for 2018. Use this rate to determine the estimated indirect manufacturing cost per wheel rim for each model, to the nearest cent.

Short Answer

Expert verified

Predetermined overhead allocation rate: $30.93

Per unit indirect cost for Standard model: $155

Per unit indirect cost for Deluxe model: $186

Step by step solution

01

Step-by-Step-SolutionStep 1: Computation of single plantwide overhead allocation rate

Predeterminedoverheadallocationrate=TotalestimatedindirectcostTotaldirectlaborhour=$463,900(5+6)×500=$463,90015,000=$30.93

02

Per unit indirect cost for the standard model

Perunitcost=Predeterminedoverheadallocationrate×Directlaborhourperrimforstandardmodel=$30.93×5=$155

03

Per unit indirect cost for the deluxe model

Perunitcost=Predeterminedoverheadallocationrate×Directlaborhourperrimfordeluxemodel=$30.93×6=$186

Unlock Step-by-Step Solutions & Ace Your Exams!

  • Full Textbook Solutions

    Get detailed explanations and key concepts

  • Unlimited Al creation

    Al flashcards, explanations, exams and more...

  • Ads-free access

    To over 500 millions flashcards

  • Money-back guarantee

    We refund you if you fail your exam.

Over 30 million students worldwide already upgrade their learning with Vaia!

One App. One Place for Learning.

All the tools & learning materials you need for study success - in one app.

Get started for free

Most popular questions from this chapter

What is the purpose of quality management systems?

The Oakman Company manufactures products in two departments: Mixing and Packaging. The company allocates manufacturing overhead using a single plantwide rate with direct labor hours as the allocation base. Estimated overhead costs for the year are $810,000, and estimated direct labor hours are 360,000. In October, the company incurred 20,000 direct labor hours.

Requirements

1. Compute the predetermined overhead allocation rate. Round to two decimal places.

Question:Western, Inc. is a technology consulting firm focused on Web site development and integration of Internet business applications. The president of the company expectsto incur \(640,000 of indirect costs this year, and she expects her firm to work 4,000direct labor hours. Western’s systems consultants provide direct labor at a rate of \)280per hour. Clients are billed at 160% of direct labor cost. Last month, Western’s consultantsspent 170 hours on Halbert’s engagement.

Requirements

1. Compute Western’s predetermined overhead allocation rate per direct labor hour.

2. Compute the total cost assigned to the Halbert engagement.

3. Compute the operating income from the Halbert engagement.

Question:Refer to Exercises E19-24 and E19-25. Suppose Western’s direct labor rate was $280 per hour. The Halbert engagement used the following resources last month:

Allocation Base Halbert

Direct labor hours 170

Pages 310

Applications used 80

Requirements

1. Compute the cost assigned to the Halbert engagement, using the ABC system.

2. Compute the operating income or loss from the Halbert engagement, using theABC system.

Koehler makes handheld calculators in two models: basic and professional. Koehler estimated $721,000 of manufacturing overhead and 515,000 machine hours for the year. The basic model actually consumed 230,000 machine hours, and the professional model consumed 285,000 machine hours.

Compute the predetermined overhead allocation rate using machine hours (MHr) as the allocation base. How much overhead is allocated to the basic model? To the professional model?

See all solutions

Recommended explanations on Business Studies Textbooks

View all explanations

What do you think about this solution?

We value your feedback to improve our textbook solutions.

Study anywhere. Anytime. Across all devices.

Sign-up for free