The Alright Manufacturing Company in Rochester, Minnesota, assembles and tests electronic components used in smartphones. Consider the following data regarding component T24 (amounts are per unit):

Direct materials cost \( 80.00

Direct labor cost 20.00

Activity-based costs allocated ?

Total manufacturing product cost ?

The activities required to build the component follow:

Activity Allocation Base Cost Allocated to

Each Unit

Start station Number of raw component chassis 4 * \) 1.50 = \( 6.00

Dip insertion Number of dip insertions ? * 0.30 = 9.60

Manual insertion Number of manual insertions 10 * 0.50 = ?

Wave solder Number of components soldered 4 * 1.90 = 7.60

Backload Number of backload insertions 7 * ? = 4.20

Test Number of testing hours 0.43 * 90.00 = ?

Defect analysis Number of defect analysis hours 0.15 * ?= 12.00

Total activity-based costs \) ?

Requirements

2. Why might managers favor this ABC system instead of Alright’s older system, which allocated all manufacturing overhead costs on the basis of direct labor hours?

Short Answer

Expert verified

The activity-based costing is preferred over traditional methods due to reasonable allocation based on different activities associated with different products.

Step by step solution

01

Activity-based costing system

Activity-based costing system is a procedure for allocating costs based on different tasks, operations, or procedures. Under activity-based costing, the overhead costs are segregated between different activities and then the different activities costs are allocated to different products or services.

02

Why activity-based costing is preferred over traditional costing

Under traditional costing, the overhead costs are allocated based on a single allocation base. That allocation base may or may not be relevant to all products. So, the cost ascertained under the traditional method may be relevant for some products but may not be relevant or fair for other products.

Under activity-based costing, the overheads are allocated based on the activities associated with different products. In this way, all products are charged for the relevant activities performed for that product. So, the cost ascertained for different products under this system is relevant and fair for all products.

Unlock Step-by-Step Solutions & Ace Your Exams!

  • Full Textbook Solutions

    Get detailed explanations and key concepts

  • Unlimited Al creation

    Al flashcards, explanations, exams and more...

  • Ads-free access

    To over 500 millions flashcards

  • Money-back guarantee

    We refund you if you fail your exam.

Over 30 million students worldwide already upgrade their learning with Vaia!

One App. One Place for Learning.

All the tools & learning materials you need for study success - in one app.

Get started for free

Most popular questions from this chapter

Goodwin, Inc. manufactures children’s sandals. Similar sandals manufactured by competitors sell for $12.50 per pair. Goodwin desires a 20% net profit margin. What is Goodwin’s target cost?

Why is JIT costing sometimes called backflush costing?

Eason Company manufactures wheel rims. The controller expects the following ABC allocation rates for 2018:

Activity Allocation Base Predetermined Overhead

Allocation Rate

Materials handling Number of parts $ 4.00 per part

Machine setup Number of setups 400.00 per setup

Insertion of parts Number of parts 26.00 per part

Finishing Number of finishing hours 90.00 per hour

Eason produces two wheel rim models: standard and deluxe. Expected data for 2018 are as follows:

Standard Deluxe

Parts per rim 4.0 7.0

Setups per 500 rims 18.0 18.0

Finishing hours per rim 1.0 5.5

Total direct hours per rim 5.0 6.0

The company expects to produce 500 units of each model during the year.

Requirements

1. Compute the total estimated indirect manufacturing cost for 2018.

Question:High Mountain produces fleece jackets. The company uses JIT costing for its JIT production system.

High Mountain has two inventory accounts: Raw and In-Process Inventory and

Finished Goods Inventory. On April 1, 2018, the account balances were Raw and In-Process Inventory, \(10,000; Finished Goods Inventory, \)2,100.

The standard cost of a jacket is \(33, composed of \)12 direct materials plus \(21

conversion costs. Data for April’s activities follow:

Number of jackets completed 19,000

Number of jackets sold (on account for \)50 each) 18,600

Direct materials purchased (on account) \( 220,500

Conversion costs incurred \) 500,000

Requirements

1. What are the major features of a JIT production system such as that of High Mountain?

2. Prepare summary journal entries for April. Underallocated or overallocated

conversion costs are adjusted to Cost of Goods Sold monthly.

3. Use a T-account to determine the April 30, 2018, balance of Raw and In-ProcessInventory.

12. Identify the following costs as prevention, appraisal, internal failure, or external failure:

a. Inspection of final products

b. Sales returns of defective products

c. Employee training

d. Reworking defective products

e. Working with suppliers to ensure delivery of high-quality raw materials

f. Costs of warranty repairs

g. Product testing

See all solutions

Recommended explanations on Business Studies Textbooks

View all explanations

What do you think about this solution?

We value your feedback to improve our textbook solutions.

Study anywhere. Anytime. Across all devices.

Sign-up for free