Question:Stella, Inc. is using a costs-of-quality approach to evaluate design engineering efforts for a new skateboard. Stella’s senior managers expect the engineering work to reduce appraisal, internal failure, and external failure activities. The predicted reductions in activities over the two-year life of the skateboards follow. Also shown are the predetermined overhead allocation rates for each activity.

Activity Predicted Predetermined

Reduction in Overhead Allocation

Activity Units Rate per Unit

Inspection of incoming raw materials 390 $ 44

Inspection of finished goods 390 19

Number of defective units discovered in-house 1,200 50

Number of defective units discovered by customers 325 72

Lost profits due to dissatisfied customers 75 102

Requirements

3. What major difficulty would Stella’s managers have in implementing this costs-of-quality approach? What alternative approach could they use to measure quality improvement?

Short Answer

Expert verified

Answer

Different approaches to the COQ model are – PQC, TCOQ, and QFD models as they remove the difficulty of complexities, and are simple to understand and measure quality.

Step by step solution

01

Major difficulty in implementing the cost-of-quality approach

The difficulties in implementing the COQ approach are as follows –

1) Measuring the quality cost is the major difficulty as every cost cannot be measured like profit loss due to unhappiness of customers.

2) Another difficulty in implementing this approach is the lack of knowledge of using this approach efficiently.

3) Another difficulty arises due to the lack of needed tools to collect, organize, filter, and report quality costs.

02

 Step 2: Alternative approaches to COQ

Alternative approaches to COQ are as follows –

1) Poor Quality cost – This is the improved model and ignores the prevention and appraisal costs as they are problematic to measure.

2) Total cost of quality – TCOQ model differs from COQ in the sense that TCOQ does not include maintenance and quality training costs as in the COQ model. Thus it is not a preferred model as that of COQ.

3) Qualified function development – QFD was developed to understand the customer requirements and maximize the quality positively by creating a comprehensive quality system.

Unlock Step-by-Step Solutions & Ace Your Exams!

  • Full Textbook Solutions

    Get detailed explanations and key concepts

  • Unlimited Al creation

    Al flashcards, explanations, exams and more...

  • Ads-free access

    To over 500 millions flashcards

  • Money-back guarantee

    We refund you if you fail your exam.

Over 30 million students worldwide already upgrade their learning with Vaia!

One App. One Place for Learning.

All the tools & learning materials you need for study success - in one app.

Get started for free

Most popular questions from this chapter

Eason Company manufactures wheel rims. The controller expects the following ABC allocation rates for 2018:

Activity Allocation Base Predetermined Overhead

Allocation Rate

Materials handling Number of parts $ 4.00 per part

Machine setup Number of setups 400.00 per setup

Insertion of parts Number of parts 26.00 per part

Finishing Number of finishing hours 90.00 per hour

Eason produces two wheel rim models: standard and deluxe. Expected data for 2018 are as follows:

Standard Deluxe

Parts per rim 4.0 7.0

Setups per 500 rims 18.0 18.0

Finishing hours per rim 1.0 5.5

Total direct hours per rim 5.0 6.0

The company expects to produce 500 units of each model during the year.

Requirements

2. Prior to 2018, Eason used a single plantwide overhead allocation rate system with direct labor hours as the allocation base. Compute the predetermined overhead allocation rate based on direct labor hours for 2018. Use this rate to determine the estimated indirect manufacturing cost per wheel rim for each model, to the nearest cent.

Stegall, Inc. manufactures motor scooters. For each of the following examples of quality costs, indicate which of the following quality cost categories each example represents: prevention costs, appraisal costs, internal failure costs, or external failure costs.

1. Preventive maintenance on machinery

2. Direct materials, direct labor, and manufacturing overhead incurred to rework a defective scooter that is detected in-house through inspection

3. Lost profits from lost sales if the company’s reputation is hurt because customers previously purchased a poor-quality scooter

4. Cost of inspecting raw materials, such as chassis and wheels

5. Working with suppliers to achieve on-time delivery of defect-free raw materials

6. Cost of warranty repairs on a scooter that malfunctions at a customer’s location

7. Costs of testing durability of vinyl

8. Cost to reinspect reworked scooters

Harris Systems specializes in servers for workgroup, e-commerce, and ERP applications. The company’s original job costing system has two direct cost categories: direct materials and direct labor. Overhead is allocated to jobs at the single rate of \(22 per direct labor hour.

A task force headed by Harris’s CFO recently designed an ABC system with four activities. The ABC system retains the current system’s two direct cost categories. Overhead costs are reflected in the four activities. Pertinent data follow:

___________________________________________________________________

Activity Allocation Base Predetermined Overhead

Allocation Rate____

Materials handling Number of parts \) 0.85

Machine setup Number of setups 500.00

Assembling Number of assembling hours 80.00

Shipping Number of shipments 1,500.00_______

Harris Systems has been awarded two new contracts, which will be produced as Job A and Job B. Budget data relating to the contracts follow:

____________________________________________________________

Job A Job B__

Number of parts 15,000 2,000

Number of setups 6 4

Number of assembling hours 1,500 200

Number of shipments 1 1

Total direct labor hours 8,000 600

Number of units produced 100 10

Direct materials cost \( 220,000 \) 30,000

Direct labor cost \( 160,000 \) 12,000__

Requirements

3. Which costing system more accurately assigns to jobs the costs of the resources consumed to produce them? Explain.

Turbo Champs Corp. uses activity-based costing to account for its motorcycle manufacturing process. Company managers have identified three supporting manufacturing activities: inspection, machine setup, and machine maintenance. The budgeted activity costs for 2018 and their allocation bases are as follows:

Activity Total Budgeted Cost Allocation Base

Inspections \( 5,700 Number of inspections

Machine setup 22,000 Number of setups

Machine maintenance 6,000 Finishing of machine hours

Total \) 33,700

Turbo Champs expects to produce 20 custom-built motorcycles for the year. The motorcycles are expected to require 100 inspections, 40 setups, and 100 machine hours.

Requirements

2. Compute the expected indirect manufacturing cost of each motorcycle.

Question:The Santos Shirt Company manufactures shirts in two departments: Cutting and Sewing. The company allocates manufacturing overhead using a single plantwide rate with direct labor hours as the allocation base. Estimated overhead costs for the year are\(500,000, and estimated direct labor hours are 200,000. In June, the company incurred 17,500 direct labor hours.

1. Compute the predetermined overhead allocation rate.

2. Determine the amount of overhead allocated in June.

The Santos Shirt Company has refined its allocation system by separating manufacturing overhead costs into two cost pools—one for each department. The estimated costs for the Cutting Department are \)200,000. They will be allocated based on directlabor hours, which are estimated to be 125,000 hours for the year. The estimated costs for the Sewing Department are $300,000.Those costs will be allocated based on machine hours, which are estimated to be 150,000 hours for the year. In June, the companyincurred 10,000 direct labor hours in Cutting and 12,500 machine hours in Sewing.

3. Compute the predetermined overhead allocation rates for each department.

4. Determine the total amount of overhead allocated in June.

See all solutions

Recommended explanations on Business Studies Textbooks

View all explanations

What do you think about this solution?

We value your feedback to improve our textbook solutions.

Study anywhere. Anytime. Across all devices.

Sign-up for free