The Alexander Manufacturing Company in Rochester, Minnesota, assembles and tests electronic components used in smartphones. Consider the following data regarding component T24 (amounts are per unit):

Direct materials cost \( 81.00

Direct labor cost 21.00

Activity-based costs allocated ?

Total manufacturing product cost ?

The activities required to build the component follow:

Activity

Allocation Base

Cost Allocated to Each Unit

Start Station

Number of raw component chassis

3 X \)1.50 = \(4.50

Dip Insertion

Number of dip insertions

? X 0.50 = 14.50

Manual Insertion

Number of manual insertions

13 X 0.40 = ?

Wave solder

Number of components solders

3 X 1.50 = 4.50

Backload

Number of backload insertions

7 X ? = 2.80

Test

Number of testing hours

0.39 60.0 = ?

Defect analysis

Number of defect analysis hours

0.10 X ? = 4.00

Total activity-based costs

\) ?

Requirements

2. Why might managers favor this ABC system instead of Alexander’s older system, which allocated all manufacturing overhead costs on the basis of direct labor hours?

Short Answer

Expert verified

The activity-based costing is preferred over traditional methods due to reasonable allocation based on different activities associated with different products.

Step by step solution

01

Step-by-Step-SolutionStep 1: Activity-based costing system

Activity-based costing system is a procedure for allocating costs based on different tasks, operations, or procedures. Under activity-based costing, the overhead costs are segregated between different activities and then the different activities costs are allocated to different products or services.

02

Why activity based costing is preferred over traditional costing

Under traditional costing, the overhead costs are allocated based on a single allocation base. That allocation base may or may not be relevant to all products. So, the cost ascertained under the traditional method may be relevant for some products but may not be relevant or fair for other products.

Under activity-based costing, the overheads are allocated based on the activities associated with different products. In this way, all products are charged for the relevant activities performed for that product. So, the cost ascertained for different products under this system is relevant and fair for all products.

Unlock Step-by-Step Solutions & Ace Your Exams!

  • Full Textbook Solutions

    Get detailed explanations and key concepts

  • Unlimited Al creation

    Al flashcards, explanations, exams and more...

  • Ads-free access

    To over 500 millions flashcards

  • Money-back guarantee

    We refund you if you fail your exam.

Over 30 million students worldwide already upgrade their learning with Vaia!

One App. One Place for Learning.

All the tools & learning materials you need for study success - in one app.

Get started for free

Most popular questions from this chapter

Define value engineering. How is it used to control costs?

Harcourt Pharmaceuticals manufactures an over-the-counter allergy medication. The company sells both large commercial containers of 1,000 capsules to health care facilities and travel packs of 20 capsules to shops in airports, train stations, and hotels. The following information has been developed to determine if an activity-based costing system would be beneficial:

Activity Estimated Estimated Quantity

Indirect Cost Allocation Base of Allocation Base

Materials handling \( 96,000 Number of kilos 24,000 kilos

Packaging 210,000 Number of machine hours 3,000 hours

Quality assurance 114,000 Number of samples 1,900 samples

Total indirect costs \) 420,000

Other production information includes the following:

Commercial Containers Travel Packs

Units produced 2,800 containers 51,000 packs

Weight in kilos 9,800 5,100

Machine hours 1,960 510

Number of samples 560 765

Requirements

2. Compute the predetermined overhead allocation rate for each activity.

Activity-based costing requires four steps. List the four steps in the order they are performed.

Eason Company manufactures wheel rims. The controller expects the following ABC allocation rates for 2018:

Activity Allocation Base Predetermined Overhead

Allocation Rate

Materials handling Number of parts $ 4.00 per part

Machine setup Number of setups 400.00 per setup

Insertion of parts Number of parts 26.00 per part

Finishing Number of finishing hours 90.00 per hour

Eason produces two wheel rim models: standard and deluxe. Expected data for 2018 are as follows:

Standard Deluxe

Parts per rim 4.0 7.0

Setups per 500 rims 18.0 18.0

Finishing hours per rim 1.0 5.5

Total direct hours per rim 5.0 6.0

The company expects to produce 500 units of each model during the year.

Requirements

2. Prior to 2018, Eason used a single plantwide overhead allocation rate system with direct labor hours as the allocation base. Compute the predetermined overhead allocation rate based on direct labor hours for 2018. Use this rate to determine the estimated indirect manufacturing cost per wheel rim for each model, to the nearest cent.

12. Identify the following costs as prevention, appraisal, internal failure, or external failure:

a. Inspection of final products

b. Sales returns of defective products

c. Employee training

d. Reworking defective products

e. Working with suppliers to ensure delivery of high-quality raw materials

f. Costs of warranty repairs

g. Product testing

See all solutions

Recommended explanations on Business Studies Textbooks

View all explanations

What do you think about this solution?

We value your feedback to improve our textbook solutions.

Study anywhere. Anytime. Across all devices.

Sign-up for free