Chapter 2: Q1PE (page 165)
A firm that makes predesigned products directly to fill customer orders has this type of production environment.
Short Answer
Make-to-order.
Chapter 2: Q1PE (page 165)
A firm that makes predesigned products directly to fill customer orders has this type of production environment.
Make-to-order.
All the tools & learning materials you need for study success - in one app.
Get started for freeA graphics reproduction firm has four automatic equipment units but occasionally becomes inoperative because of the need for supplies, maintenance, or repair. Each Unit requires service roughly twice each hour, or, more precisely, each Unit of equipment runs an average of 30 minutes before needing service. Service times vary widely, ranging from a simple service (such as pressing a restart switch or repositioning paper) to more detailed equipment disassembly. The average service time, however, is minutes. Equipment downtime results in a loss of \(20 per hour. The one equipment attendant is Paid \)6 per hour.
Using finite queuing analysis, answer the following questions:
C. What is the average number of units being serviced?
Question: Calculate the probability of zero patients in the system (P0), the probability of one patient (P1), and the probability of two or more patients simultaneously arriving during the night shift.
What are the four basic techniques for measuring work and setting time standards?
This is a part of an organization that takes inputs and transforms them into outputs.
Question: An important difference between service and manufacturing operations is that customers introduce far more variability into the operations in a service system. Name at least three of the basic types of variation that customers bring to a service system.
What do you think about this solution?
We value your feedback to improve our textbook solutions.