How does synchronous manufacturing differ from MRP with respect to scheduling?
Short Answer
In terms of scheduling, MRP utilizes backward scheduling;on the other hand,synchronous manufacturing uses forward scheduling.
Chapter 4: Q13OQ (page 646)
How does synchronous manufacturing differ from MRP with respect to scheduling?
In terms of scheduling, MRP utilizes backward scheduling;on the other hand,synchronous manufacturing uses forward scheduling.
All the tools & learning materials you need for study success - in one app.
Get started for freeWhat are the sources of demand in an MRP system? Are these dependent or independent, and how are they used as inputs to the system?
What are the advantages and disadvantages of aggregating demand from a forecasting view? Are there other things that should be considered when going from multiple DC’s to one DC?
Question: A set of processes to enable vendor-driven replenishment.
If the tracking signal for your forecast was consistently positive, you could then say this about your forecasting technique?
Question: The essence of yield management is the ability to manage what?