Chapter 4: Q21-20OQ (page 583)
The MRP gross requirements for Item A are shown here for the next 10 weeks. Lead time for A is three weeks and setup cost is \(10. There is a carrying cost of \)0.01 per unit per week. The beginning inventory is 90 units.
Use the least total cost or the least unit cost lot-sizing method to determine when and for what quantity the first order should be released.
Short Answer
A Material Requirements Planning (MRP) system is a manufacturing planning as well as decision-making technique for analyzing current stock levels vs. manufacturing capacity as well as the need to make items depending on projections.