Chapter 4: Q3PE. (page 585)
This drives the MRP calculations and is a detailed plan for how we expect to meet demand.
Short Answer
Master Production Schedule (MPS).
Chapter 4: Q3PE. (page 585)
This drives the MRP calculations and is a detailed plan for how we expect to meet demand.
Master Production Schedule (MPS).