Chapter 15: Problem 6
For each of the assumptions of classic scheduling theory, give an example of when it might be valid. Give an example of when each is not valid.
Chapter 15: Problem 6
For each of the assumptions of classic scheduling theory, give an example of when it might be valid. Give an example of when each is not valid.
All the tools & learning materials you need for study success - in one app.
Get started for freeWhy do people use dispatching rules instead of finding an optimal schedule?
What higher-level planning problems are related to the production scheduling problem? What are the variables and constraints in the high-level problems? What are the variables and constraints in the lower-level scheduling problem? How are the problems linked?
Why is average tardiness a better measure than average lateness?
What are some drawbacks of using service level as the only measure of due date performance?
What motivates maximizing utilization? What motivates not maximizing utilization?
What do you think about this solution?