For each of the following situations, indicate whether you would be inclined
to use CONWIP (C), kanban (K), PFB (P), or an individual system (I) for shop
floor control.
(a) A flow line with a single-product family.
(b) A paced assembly line fed from inventory storage.
(c) A steel mill where casters feed hot strip mills (with slab storage in
between), which feed cold rolling mills (with coil storage in between).
(d) A plant with several routings sharing some resources with significant
setup times, and all routings are steadily loaded over time.
(e) A plant with many routings sharing some resources but where some routings
are sporadically used.