Chapter 3: Problem 15
Why do we perform all the MRP processing for one level before going to the next-lower level? What would happen if we did not?
Short Answer
Expert verified
Answer: It is important to process MRP for one level before moving on to the next lower level to ensure an accurate and timely production plan for each level. This approach helps minimize production delays, reduce excess inventory, and optimize overall supply chain management. Not following this approach can compromise the accuracy of the production plan and may cause a ripple effect throughout the supply chain, leading to a lack of materials needed for production, delays in production, increased inventory holding costs, and stockouts. Consequently, the overall efficiency and effectiveness of the MRP system will be diminished, potentially leading to negative business outcomes.