Chapter 7: Problem 3
For a given set of production line characteristics (i.e., raw process time \(T_{0}\) and bottleneck rate \(r_{b}\) ) and a given WIP level \(w\), what is the best cycle time that can be achieved? What is the "worst"? What is the corresponding throughput for these two cases?
Short Answer
Step by step solution
Key Concepts
These are the key concepts you need to understand to accurately answer the question.